    GRP1000IMS Measurement Application Case On Hanghuang High-Speed Railway



    First, application background

    Compared with the interval line measurement, the station area ballast measurement has the following characteristics: higher precision requirements, wider gauge, tighter tip rails, and guide rail switching. The number of new line switches and the number of models are numerous, and the measurement tasks of the interval lines are heavy, which puts higher requirements on the accuracy and efficiency of the measuring equipment. In this context, the Hangzhou Works Department newly purchased a GRP1000IMS equipment and fine-tuned the drums in the Hanghuang Railway (in the section of the Shanghai Railway)



    Second,application overview

    Scope of operation:  Hangzhou South Line, Yangcun Bridge Line, Fuyang Station, Tonglu Station, Qiandaohu Station, Jiande Station, and section lines;

    Switch model:  CNNT18# turnout, CNNT42# turnout, domestic 18# turnout;

    So far, the long-track static fine-tuning drum operation using the GRP1000IMS equipment has been completed, and the joint adjustment test is underway.



    Third, measurement operations

    1. Since the measurement range includes the helium zone, the gauge and guide rails are manually defined.

    ?  Gauge: The widened area is divided into the left and right sides of each sleeper according to the mileage. The non-widened area defines the mileage range according to the flat curve, and the gauge is 1.435.


    ?Guide rail: Manually define the straight-point rail as the plane guide rail according to the mileage range of the switch (the ballast is extended according to the actual situation before and after the turnout), and the interval track is customized according to customer requirements.


    2. GRP1000IMS is a relative plus absolute measurement principle.

    Inertial navigation is used to measure the three-dimensional trajectory of the track; the gauge is measured by the trolley and the super-high; the total station is used for the non-leveling every 60 meters (no flaw) / 120 meters (with flaw) Absolute positioning of the trolley, after the end of the operation, the raw data is pre-processed by software to obtain the measured three-dimensional absolute coordinates of the orbit.

      

    ?  Measurement mode adopts multi-point constraint

    ?  Set the station requirements: the number of control points involved in the calculation is not less than 6, the mesh shape is better, to ensure that the trolley has points before and after

    ?  The speed of implementation should not be too slow or too fast, it is recommended to 1.5~2.0 m / s

    ?  Try not to return or stagnate for a long time during the implementation process


    Fourth, data analysis

    1. The software can export various styles of reports according to the needs of on-site operations. 

    Hang Huang performs large-scale gongs and drums on site, and the software exports corresponding GEO linear files, VER dialing data files, SYN control point mileage files.

    2. Guide the drum operation according to the measured data, compare the TQI before and after the drum.


    1.png


    3. Comparison of measurement data between GRP1000IMS and Shanghai 4D in the same section

            N6 Road (Amberg)                                       N6 ballast (four-dimensional)

      2.png

    Amberg: lowest point: DK137+889 (-6mm) highest point: DK137+875 (5mm)

    Shanghai 4D: lowest point: DK137+890 (-7mm) highest point: DK136+872 (7mm)

    Analysis: The line shape and the highest and lowest points of Amberg and the Shanghai 4D solution are basically the same, with a difference of 1~2 mm.


    Fifth, conclusion

    Through the comparison of TQI before and after the gongs and drums, it shows that the trolley guides the big machine gong and drum effect is obvious, and meets the requirements of high precision and high efficiency under different working conditions, no matter from the field measurement operation or the internal data processing, greatly simplify the operation process, help The public surveyor has improved work efficiency.













    In the previous: Application of GRP5000 on Shuohuang Railway

    The next article: The 15th China International Modern Railway Technology and Equipment Exhibition 2019

北京力鐵軌道交通設(shè)備有限公司 美女操逼抽插视频黄片版| 日本熟妇人妻video| А√天堂中文最新版地址| 字幕中文乱码的解决方法| 九九热线精品视频免费观看| 久久亚洲av成人一二三区| 亚洲一区二区三区四区高清| 亚洲欧美日韩中文字幕一区| 日韩美女爱爱视频一区 | 黄色av免费网站在线观看| 男人和女人日逼黄色视频| 日本第一区在线观看视频| jav一卡二卡三卡无码| 久久久久久精品sssss| 4k欧美视频网| 日本高清中文一区二区三区| 多根黑鸡巴操逼视频看看| 国产精品久久国产精麻豆| 91精品国产综合久久蜜桃| 青娱乐蜜桃视频| 夫妻性生活真人真事视频| 又色又爽又黄的视频大全| 亚洲国产AV精久久无码| 国产秘三级一级二级三级| 91在线精品中文字幕在线| 亚洲国产精品久久久牛牛| 屄屄日肥屄影院| 91老熟女老女人国产老| 亚洲中文自拍另类av片| 久9视频这里只有精品试看| 日逼网站短视频| 久草福利新在线| 88MAV国产精品一区| www视频在线观看视频| 久久夜午夜精品视频免费| 99久久精品费精品视频| h视频网站免费在线 白| 男生把坤坤插进女生屁眼| 久久99精品免费一区二区| 亚洲最大成人一区久久久| 操逼大骚逼视频|